Project setup
Create projects and configure their pages.
2 articles availableChoose a task or search the available guides by object, function or help ID.
Search 58 articles
No matching article. Try an object name or help ID.
Understand simulation, driver selection and device profiles. Configure Modbus TCP, Siemens S7, and OPC UA, then verify your first value.
Start here: symbols and address formats, local simulation and unavailable PLC connections.
Learn how to build a process screen from displays and controls, then start a small practice project.
Name a project, wait for its files to be created and begin on the main page.
Add an Anlagenübersicht page, set up its working area and save it with the project.
Create the heading Anlagenübersicht in 36-pixel bold text with the Pamaglawe teal color.
Place a tank and configure its dimensions.
Place a narrow level bar within the tank.
Add a readable percentage below the bar inside the tank.
Copy a cylinder formula into the project and use it for value output.
Prepare an input showing 60 beside the tank, in design mode without writing to a PLC.
Prepare an on/off toggle below the setpoint field without assigning a process connection.
Configure a button from Anlagenübersicht to Hauptseite and a return button, then test both directions.
Map preview value 2 to the red message Störung, then add English translations.
Prepare a text input containing CH-001 with the caption Charge.
Four individually labeled segments display machine status, material requests or operating conditions.
A trend records up to six process values against time, each with its own name, source and color.
An alarm object displays messages from its own configured data source, address range and message definitions on the page where it is placed.
Define project-wide alarm messages and test the complete active, acknowledged and cleared sequence with a local simulation button.
Configure operating mode and assign a dedicated process symbol.
Configure checkbox and assign a dedicated process symbol.
Configure option group and assign a dedicated process symbol.
Configure on/off switch and assign a dedicated process symbol.
Configure setpoint slider and assign a dedicated process symbol.
Configure numeric stepper and assign a dedicated process symbol.
The traffic light has red, yellow and green lamps in a fixed order.
The operating-hours display converts a numeric counter into a duration or decimal hours.
Date / Time uses the system clock of the computer running PamaGlawe.
Progress shows a numeric process value as a filled bar and a number.
A hotspot is an invisible clickable area in Play mode.
LCD renders a process value as segment digits in DEC, BIN, HEX or OCT.
The gauge shows a measurement with a pointer and an optional numeric value beneath it.
Status reports whether recent data has arrived for the assigned device or IP address.
A value table combines up to sixteen independently assigned values.
X controls horizontal position and Y vertical position.
The state display maps up to sixteen exact PLC values to messages.
A compact, separately printable reference for selecting and editing objects in design mode.
A collapsible area groups objects beneath a clickable header. Assigned contents are hidden when collapsed and shown again when expanded. This example includes a button.
Line / Arrow draws a straight line with optional arrowheads. Choose a fixed color or change the color according to a process value. This example checks off, on and fault states.
Create shift handover notes with an author and recipient, then mark entries as read or open.
Insert a PID controller, explore proportional control in simulation and set the output manually.
Draw a right-angle polyline, add an end arrowhead and control its color with a dedicated process symbol.
Insert a group frame, add a caption and format its heading to match the process page.
Insert a tab container, name its tabs and switch between their assigned contents.
Create a test recipe with one setpoint, validate its limits and verify the confirmed transfer to the Modbus test server.
Insert a vertical scroll area, set its inner height and assign displays to its scrollable contents.
Build simulation logic step by step: insert IF and CASE blocks at the cursor, add commands and test execution with Start, Pause, Continue and Stop.
Configure project accounts, understand role permissions and test allowed and blocked actions with a practice account.
Link a PDF to a process page: select a file, configure its display and read or print the document in play mode.
Use Browse to choose a PDF, such as an older batch report or service report. Learn how this differs from a configured PDF and which permissions apply.
Configure a process protocol, start and finish it manually or through a PLC trigger, and document start/end readings or statistical values.
The top bar from left to right: project commands, settings, tools, grid controls, play mode and application exit.
Understand top-bar settings for image editing, startup, date/time, fonts, on-screen input, communication and language.
Communication table and editor: find signals, understand sources, edit rows, save CSV files and validate the table.
Select interface texts, maintain translations and save language files. Understand source text, fallbacks and application-wide effects.
Create transparent PNGs, draw individual pixels, sample colours and insert images. Understand image size, zoom and saving.
Browse project objects by page and type, search names or signals and jump directly to a matching object.
Review notices, warnings and errors, navigate to affected objects and deliberately mark tasks as completed.
Select installed packages, understand activation status and open libraries. Distinguish installation, activation and role permissions.
Get to know Pamaglawe, understand the key terms and begin a first practice project.
Open introduction →Create projects and configure their pages.
2 articles availableBasic objects, controls, displays, structure and documents: find guides by object group.
View all object guides → !Prepare alarms independently of the driver, load tables and work with the event history.
Open alarm guide → ↔Understand simulation, driver selection and device profiles. Configure Modbus TCP, Siemens S7, and OPC UA, then verify your first value.
Open guide → VCreate ST programs, insert IF and CASE at the cursor and test local sequences.
Open virtual PLC guide → RCreate a test recipe, configure setpoints and limits, then verify its transfer.
Open guide → ✓Configure accounts and roles, check permissions and manage sign-in.
Open guide → !Missing values, blocked controls, virtual PLCs and saving: check common causes and find the relevant guides.
Open guide →Note the help ID, describe the problem and prepare your support request.
Ticket feature in preparationConfigure cleaning sequences with steps, actuator requests, setpoints and waiting conditions.
Part of the CIP / sequence control add-on library. The package must be loaded and activated; role permissions also apply.
Detailed module guide in preparationMaintenance intervals, operating hours, due dates and maintenance history.
Part of the Maintenance & operating hours add-on library. The package must be loaded and activated; role permissions also apply.
Detailed module guide in preparationConfigure storage type and structure, maintain materials, book stock and track stacker-crane orders.
Fixed-location and chaotic storage add-on; activation and role permissions required.
Detailed module guide in preparation